Browse: Academic > School of Computing, Engineering and Built Environment > Department of Construction and Surveying

Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 18.

[img]
Preview
Demolition and Alterations -
Shared with: World - by

[img]
Preview
In-Situ Concrete Part 1 -
Shared with: World - by

[img]
Preview
Measurement 2: Pitched Roofs -
Shared with: World - by

[img]
Preview
Measurement 1 Feedback and Revision -
Shared with: World - by

[img]
Framing Blog -
Shared with: World - by

[img]
Pictogram Blog -
Shared with: World - by

[img]
Preview
Carmuirs Tunnel Demolition -

Shared with: World - by

[img]
Preview
Alan White Design Guest Lecture - V&A Dundee Temporary Works -
Shared with: World - by

[img]
Preview
Revision of Part 3 -

Shared with: World - by

[img]
Preview
TWf Website Overview -

Shared with: World - by

[img]
Preview
Temporary Works Forum Meeting 20 March 2019 - B514/26 Presentation -

Shared with: World - by

[img]
Preview
Temporary Works Forum meeting - 18th September 2019 - Willesden - Gantry Crane B Removal and Pulldown -

Shared with: World - by

[img]
Preview
Temporary Works Forum meeting 18th September 2019 - Mabey - Glasgow School of Art -

Shared with: World - by

[img]
Preview
Temporary Works Forum meeting 18th September 2019 - Will Rudd - Advocate Close -

Shared with: World - by

[img]
Preview
Temporary Works forum Meeting 4-12-19 - Civil And Structural Engineering - Shiekh Zayed Bridge -

Shared with: World - by

[img]
Preview
Temporary Works forum Meeting 4-12-19 - TWD Engineered to function -

Shared with: World - by

[img]
Interact 2019 -
Shared with: University - by

[img]
GCU Inaugural Professorial Lecture: The Feasibility and Challenges of tall Timber Buildings after the Grenfell Tower Fire Disaster. -

Shared with: Selected Users - by Users 87518 not found.

This list was generated on Sun Nov 24 06:40:06 2024 UTC.